Show/Hide

Bid Results

Print
Press Enter to show all options, press Tab go to next option

Bid Results

CITY OF CALISTOGA 

FLOW METER INSTALLATION PROJECT 

BID RESULTS
July 23, 2019
2:00pm

 

Two bids received, here are the results:

1. Allard General Engineering is the “Apparent low bidder” with total base bid of: $307,410.00
2. Maggiora $ Ghilotti, Inc. with total base bid of: $397,397.00