Show/Hide

PG&E Public Safety Power Shutoffs begin Tuesday, 10/8 at Midnight, Click here for more information.

Bid Results

Print
Press Enter to show all options, press Tab go to next option

Bid Results

CITY OF CALISTOGA 

FLOW METER INSTALLATION PROJECT 

BID RESULTS
July 23, 2019
2:00pm

 

Two bids received, here are the results:

1. Allard General Engineering is the “Apparent low bidder” with total base bid of: $307,410.00
2. Maggiora $ Ghilotti, Inc. with total base bid of: $397,397.00